
// Service 05
Commissioning, Burn-in & Acceptance
Turn installed hardware into accepted, production-ready capacity.
// The problem
Installed is not the same as ready. Weak components must be caught before customer workloads start, not after.
// Scope
- Power-on and firmware baseline
- Burn-in and stress testing
- Fabric bring-up and validation support
- Failed component replacement and RMA handling
- Acceptance testing with your platform team
// FAQ
// Next step
Have racks arriving soon?
Get a scoped proposal within 48 hours. Start with a fixed-scope pilot.