AASGService

// Case studies

Results, not promises.

Selected engagements. Client names withheld under NDA.

Neocloud · Mexico

512-GPU training cluster live in 21 days

Challenge

A GPU cloud needed a new cluster online before a customer contract start date.

Approach

Pre-mobilization site audit, two parallel crews, fabric cabling with two-person verification.

Results

  • — 21 days dock to acceptance
  • — 0 re-visits
  • — 100% links tested

Colocation · Brazil

Liquid-cooled hall retrofit

Challenge

Retrofit a live hall for direct-to-chip cooled racks without tenant downtime.

Approach

Night change windows, pressure-tested manifolds, coordinated facility handoffs.

Results

  • — 40 racks converted
  • — 0 leaks at handover
  • — No tenant incidents

Enterprise · Colombia

24/7 smart hands for private AI

Challenge

A financial group needed reliable on-site support for its in-house inference cluster.

Approach

Priority SLA retainer, preventive maintenance calendar, monthly reporting.

Results

  • — 4h critical response
  • — 99.9% node availability
  • — Monthly SLA reviews

// Next step

Have racks arriving soon?

Get a scoped proposal within 48 hours. Start with a fixed-scope pilot.

Request a quote